• Home
  • About Us
  • Landfill Reports
  • Asbestos
  • Projects
  • Services
  • Contact Us
250-850-7511

Call Today

Barge Unloading

Northwin Environmental in conjunction with Upland Contracting was tasked by Rio Tinto for the barging, transport and disposal of approx. 50,000 tons of drill muck, waste concrete and material from the successful completion of the Kemano tunnels. This project had required observance of very difficult timelines due to barge schedules and client timelines. There were no incidents of either injuries or vehicle accidents as a result of almost 9 months of the project life.
Share
Client
Upland Contracting
Release Date
2021-2022
contain-a-way-logo-2024-FINAL
upland-excavating
Up_Construction-removebg-preview
GFL_Logo_2-removebg-preview
Campbell-River-Marine-Terminal-Logo
logo

Northwin

Northwin  Environmental Landfill is a provincially permitted construction demolition landfill. We accept construction demolition waste, contaminated soils, and asbestos.

  • Contact Us
  • Suite 315-1434 Ironwood Street, Campbell River, BC V9W 5T5
  • 7295 Gold River Highway, Campbell River, BC V9H 1P1
  • 250-850-7511 - Office
  • 250-202-8644 - Brian
  • bfagan@northwinenv.com
  • accounting@northwinenv.com
  • Hours of Operation
  • Monday to Friday
  • 8:00 am – 4:00 pm
  • CLOSED: Saturday, Sunday and Statutory Holidays
  • Contact Us
  • Brian Patrick Fagan
  • Terry Stuart
  • Gov.BC.caTransporting Hazardous Waste
© 2025 Northwin. All rights reserved.
Shopping Basket